Languages : 

Topics




newsletter

Découvrez le numéro 2, NEWSLETTER


Consultez nos offres
operations feedbacks

Si vous le souhaitez, nos techniciens peuvent prendre la main à distance sur votre ordinateur



BOSCH RODEZ - FRANCE

BAREXPERT






2006/2009

Mission in 2006 :
•    Detailed energy analysis.
•    Measurement plan to set up BARexport to examine, calculate power and follow up all fluids of the plant.  Setting up of BARexpert system.
•    Saving 8% of annual power bill with under 2 years pay back. 
Targets:
•    To reduce general power consumption to 10% by 2010.
Mission in 2006-2007:
•    Setting up Barexport system. Analysis of cooling system production, AC, compressed air, hot water.
Mission 2008-2009:
•    Engineering to re-configure refrigeration gerneration ans distribution.
Mission 2007-2009:    
•    Applay energy action plan and follow up the results.
•     Success fee contract over 2 years.


[ RETOUR ... ]